F0546 — 29–30/09/1944: o limite leste do 6º RCT é deslocado 6 milhas para E (passa a incluir o vale do Serchio), objetivo Castelnuovo [di Garfagnana]; o III Btl substitui o III/370th Inf. em 29/09 e chega a Fornoli (junção Lima–Serchio) em 30/09; I e II Btls seguem pelas montanhas ao N do Prano; elementos do I Btl entram em Stazzema em 29/09
CONFIRMADO PARCIAL CONFLITO
- Trecho: "The 6th Combat Team, BEF, with its eastern boundary shifted 6 miles to the east to include the Serchio Valley, was given the objective of reaching Castelnuovo, 15 miles up the Serchio from the junction with Lima Creek. The 3d Battalion, after relieving the 3d Battalion, 370th Infantry, on 29 September, reached Fornoli at the junction of the rivers on the 30th; the 1st and 2d Battalions continued through the mountains north of Mount Prano. Elements of the 1st Battalion entered Stazzema on the 29th" — S147 p. 106–107 (parte 6, PDF p. 24–25; https://cgsc.contentdm.oclc.org/digital/api/collection/p4013coll8/id/1543/download) · item http://cgsc.contentdm.oclc.org/u?/p4013coll8,1553
- Fonte: S147
- Status: CONFIRMADO Fornoli ocupada em 30/09 (S147 + S005/F0386) · PARCIAL Stazzema em 29/09 pelo I/6º RI e substituição do III/370th (só S147). ·Stazzema 29/09 CONFIRMADO (S038 p. 28, F0609; patrulhas já em 27/09, F0606) · substituição do III/370th: CONFLITO 27 × 29 × 30/09 (F0605, pergunta 175) · Fornoli: S038 29/09 × S002/S147 30/09
Fontes
- S147 *Fifth Army History, Part VII: The Gothic Line (16 August–15 December 1944)*
- S005 Relatório – Campanha da Itália do 1º Esquadrão de Reconhecimento (1ª DIE)
- S038 Relatório – Infantaria Divisionária (I.D.E./1) – Organização, estacionamentos e operações (1944–45)
- S002 Relatório das Atividades do 6º R.I. – Campanha da Itália (1ª a 4ª Parte + Movimento do Pessoal)
Páginas citadas no acervo
- Nenhuma página do acervo identificada.