✶ A FEB na Itália 1944 · 1945
Fato · eixo combates · S133 (IV Corps, pp. 3–27)

F0501 — Missão da 1ª DIE na ofensiva (IV Corpo): manter posições, reconhecer e, por ordem do Corpo, seguir a retirada inimiga pela estrada Zocca – Guiglia – Bazzano ou pela alternativa Monte Ombraro – Zappolino; havia planos para um avanço limitado a NW para ocupar Montese

CONFIRMADO PARCIAL

  • Trecho: "The Brazilians were to hold defensive positions, reconnoiter, and on IV Corps order would follow up any enemy withdrawal along either the road Zocca-Guiglia-Bazzano or the alternate route through Monte Ombraro and Zappolino. Detailed plans for a limited advance to the northwest to occupy Montese and the neighboring high ground had been made by the staffs concerned" — S133 p. 25 (PDF 36) [imagem IVCorps-FC-036] · https://88thinfantrydivisionarchive.com/italy/finalcampaign-acrossnorthwestitaly-145pgs.pdf
  • Status: PARCIAL (só S133) para os eixos; coerente com o avanço real por Zocca–Guiglia (S005, linhas 22d.13–22d.15) · CONFIRMADO o plano de Montese (S133 + S032/S049, F0263, F0340).

Fontes

  • S133 "The Final Campaign across Northwest Italy, 14 April – 2 May 1945"
  • S005 Relatório – Campanha da Itália do 1º Esquadrão de Reconhecimento (1ª DIE)
  • S032 Relatório – Operações do 9º Batalhão de Engenharia na Itália ("História da Guerra")
  • S049 Relatório de Operações do 11º Regimento de Infantaria na Campanha da Itália (1944–45)

Páginas citadas no acervo

  • Nenhuma página do acervo identificada.