✶ A FEB na Itália 1944 · 1945
Fato · eixo unidades · S133 (IV Corps, pp. 3–27)

F0494 — Depois da operação Monte della Spe – Castelnuovo (mar/1945), o 81st Cavalry Reconnaissance Squadron assume frentes crescentes à direita do IV Corpo e as unidades brasileiras que ficavam entre ele e a 10ª de Montanha são "pinched out"; a FEB é reagrupada numa só parte do flanco esquerdo, em vez de duas porções não contíguas

CONFIRMADO PARCIAL

  • Trecho: "Following the Monte della Spe - Castelnuovo operation, the 81st Cavalry Reconnaissance Squadron [...] was attached to IV Corps and took over gradually increased frontages on the right of the corps zone, until, with a corresponding movement to the east of 10th Mountain elements, the Brazilian units that had been holding between the two were entirely pinched out. This permitted the regrouping of the BEF in one part of the left flank, instead of having the division responsible for two different non-adjacent portions of the line." — S133 pp. 9–10 (PDF 20–21) [imagens IVCorps-FC-020, -021] · https://88thinfantrydivisionarchive.com/italy/finalcampaign-acrossnorthwestitaly-145pgs.pdf
  • Status: CONFIRMADO a ida da 1ª DIE para o flanco W do IV Corpo, substituindo a 10ª de Montanha, em mar/1945 (S133 + S032, F0258/linha 22m) · PARCIAL o papel do 81st Cav Rcn Sqn (só S133).

Fontes

  • S133 "The Final Campaign across Northwest Italy, 14 April – 2 May 1945"
  • S032 Relatório – Operações do 9º Batalhão de Engenharia na Itália ("História da Guerra")

Páginas citadas no acervo

  • Nenhuma página do acervo identificada.